  • Week 1
    • 1.The Game Called the SAP Exam: Hands-On Techniques for Decomposing Scenarios
    • 2.IAM, STS, and Federation: Splitting the Word "Permission" into Six Layers
    • 3.The Anatomy of a VPC: What Route Tables Really Decide
    • 4.Four Compute Pillars in Depth: Revisiting Nitro, EBS, ELB, and Auto Scaling Through a Pro Lens
    • 5.Week 1 Integration: When IAM, VPC, and EC2 Meet in a Single Scenario
  • Week 2
  • Week 3
  • Week 4
  • Week 5
  • Week 6
    • 1.7R Migration Strategies: Decision Language for Cloud Migration
    • 2.AWS MGN Deep Dive: The Physics of Block-Level Replication, Comparison with DRS, and Migration Hub Orchestrator
    • 3.AWS DMS + SCT: The Science of Database Migration
    • 4.Migration Acceleration Tools: App2Container, MAP, Migration Hub
    • 5.Week 6 Review: Integrated Migration Strategy Scenarios
  • Week 7
  • Week 8
  • Week 9
  • Week 10
  • Week 11
  • Week 12
  • Week 13
  • Week 14
  • Week 15
  • Week 16
DOP-C02 · ProfessionalDevOps Engineer - Professional
Linux Master 2 · 2급KAIT Linux Master - Level 2
SCS-C03 · SpecialtySecurity - Specialty
Linux Master 1 · 1급KAIT Linux Master - Level 1
MLA-C01 · AssociateMachine Learning Engineer - Associate
AIF-C01 · FoundationalAI Practitioner - Foundational
DEA-C01 · AssociateData Engineer - Associate
MLS-C01 · SpecialtyMachine Learning - Specialty
SQLD · 개발자SQL Developer (SQLD)

© CertNote · 주간랩스

  • About
  • Changelog
  • Contact
  • Terms
  • Privacy
← SAP-C02/Week 6/Day 1

Based on the SAP-C02 exam guide·Report an error

SAP-C02· ProWeek 6 · Day 1~27 min read

Day 1 - 7R Migration Strategies: Decision Language for Cloud Migration

"Migrating to the cloud" is far less clear than it sounds. Does it mean moving servers as-is, changing the database engine, or redesigning the architecture entirely? In the early 2010s, Gartner first organized cloud migration strategies into 5 Rs, and AWS has since enhanced this with Relocate and Refactor to propose a 7R framework. Today, most enterprise migration projects use these 7Rs as their decision-making language.

The SAP-C02 Domain 3 (Migration & Modernization) is not simply about memorizing tool names. It's about the ability to judge "which R is correct?" in a scenario, and then immediately map that R to the corresponding tools. The 7Rs are a continuous spectrum, each with different levels of effort, cost, ROI, and risk.

7R Framework: Understanding as a Spectrum

The 7Rs are ordered by "magnitude of change."

No change ◄─────────────────────────────────────────► Complete redesign
Retire | Retain | Relocate | Rehost | Repurchase | Replatform | Refactor
RDefinitionChange MagnitudeEffortRepresentative ToolROI Timeline
RetireDecommission systems no longer neededNoneMinimalADS after discoveryImmediate (cost elimination)
RetainKeep on-premises as-isNoneNone—None
RelocateMove hypervisor as-isInfrastructure location onlyMinimalVMware Cloud on AWSFast (1-3 months)
RehostLift-and-Shift, keep OS and appInfrastructure location onlyLowAWS MGNFast (1-6 months)
RepurchaseReplace with SaaS solutionComplete platform replacementMediumSaaS purchaseMedium-term (operational savings)
ReplatformConvert some components to managedPartial changesMediumMGN + DMS/SCTMedium-term (operational efficiency)
RefactorCloud-native redesignComplete changesHighA2C, Refactor SpacesLong-term (maximum ROI)

💡 Related Theory: The Strangler Fig pattern (Martin Fowler, 2004) gradually wraps a legacy system with new services instead of replacing it all at once, eventually strangling it out of existence. Named after the tropical strangler fig tree that wraps around a host tree, grows, and eventually stands alone when the host dies. This pattern is a risk-mitigation approach for Refactor strategies, and Refactor Spaces provides it as a managed service.

📚 Case Study: Capital One's AWS Migration (2019). One of America's largest banks began its AWS migration in 2012 and declared complete data center closure in 2019. Over a seven-year journey, they started with simple Rehost and gradually shifted to Refactor. Result: 75% reduction in deployment cycles, 35% reduction in infrastructure costs. Lesson: 7Rs are a strategy, not a one-time choice. Different Rs apply to different systems, and you migrate across them over time.

Detailed Analysis of Each R

Retire: The Value of Decommissioning

The most overlooked R in migration assessment. When you look at actual usage patterns with ADS (Application Discovery Service), many enterprises find that 10-30% of their portfolio systems are actually unused or rarely used.

Criteria for identifying Retire candidates:

  • Average CPU < 5%, minimal network traffic
  • Last user login more than 6 months ago
  • No clear owner or purpose unclear
  • Identical functionality already provided by another system

⚠️ Pitfall: Retire means "decommission," not "keep on-premises without migrating." Keeping something on-premises without migrating is Retain. On the exam: "How do you handle unused systems?" → Retire. "How do you handle systems with low ROI from migration?" → Retain.

Retain: Strategic Choice to Keep On-Premises

Retain is not a failure or concession—it's a strategic choice. It's appropriate in these cases:

  • Regulatory requirement for on-premises data (some country-specific financial regulations)
  • Migration cost > post-migration savings
  • Recent major on-premises investment (within depreciation period)
  • Technical migration path unclear (e.g., mainframe)

🔍 Deeper Dive: Retain is not a permanent strategy. Regulatory changes, contract expirations, or business shifts can move systems from Retain to another R. Best practice from the AWS MAP program is to document why each system is Retain and revisit every 12-18 months.

Relocate: VMware-Specific Case

Relocate has practical meaning only in VMware environments. VMware Cloud on AWS (VMC) places the VMware vSphere/NSX/vSAN stack directly on AWS bare-metal servers. Customers continue using existing VMware tools (vCenter, vSphere, NSX) while running on AWS infrastructure.

Advantages of Relocate:

  • Seamless migration with vMotion
  • Retain existing VMware licenses, tools, and skills
  • Integration with AWS services (S3, RDS, Lambda) possible

Limitations of Relocate:

  • Complete utilization of cloud-native services is limited
  • VMware licensing costs continue
  • Long-term shift to Rehost or Refactor recommended

Rehost (Lift-and-Shift): Speed First

Rehost is the fastest migration path. You move OS, middleware, and application code unchanged to EC2. Tool: AWS Application Migration Service (MGN). MGN performs block-level replication to create an identical EC2 instance from the source server.

Rehost is "the first step of your cloud journey." The realistic strategy is to get to the cloud first, then gradually move to Replatform and Refactor.

💡 Related Theory: Pace-Layer strategy (Gartner). Layer systems by rate of change and apply different strategies to each. Fast-changing innovation layer (new apps) → Refactor, mid-pace business apps → Replatform, slow-changing records layer (ERP, mainframe) → Rehost or Retain. The failure of "big-bang" migrations often comes from ignoring this Pace-Layer.

Repurchase: SaaS Conversion

Replace an application running on-premises or IaaS with a SaaS solution.

On-Premises SystemSaaS Replacement
In-house CRMSalesforce
In-house email serverMicrosoft 365, Google Workspace
In-house HR systemWorkday
In-house contact centerAmazon Connect
In-house LMSCornerstone, Docebo

Exam clues for Repurchase: "minimize operational burden," "allow IT staff to focus on core business," "eliminate legacy software licenses."

⚠️ Pitfall: Repurchase requires data migration and process change. It's easy to assume "no operational burden," but migrating existing data to SaaS and retraining staff is substantial. High short-term cost, large long-term ROI.

Replatform: Maintain Core Architecture, Partial Optimization

Change infrastructure layer components to managed services without changing code.

Key Replatform patterns:

OriginalTargetBenefit
Oracle DB on EC2Aurora PostgreSQL (DMS + SCT)License savings, managed
MySQL on EC2Amazon RDS MySQLAutomatic backups, HA, patching
Tomcat on EC2AWS Elastic BeanstalkAutomated platform management
Redis on EC2ElastiCache for RedisManaged cluster
Windows ServerWindows EC2 on AWS (OS upgrade)License optimization

Replatform is suitable when you see these clues: "reduce DB operational burden," "automate OS patching and backup," "cut costs through engine replacement," "minimal code changes."

📚 Case Study: GE's Oracle to Aurora Migration (2018). General Electric Replatformed dozens of Oracle DB instances to Aurora PostgreSQL. Oracle Enterprise licensing alone saved millions annually. SCT automatically converted approximately 70% of PL/SQL stored procedures; the remainder required manual fixes. Lesson: Heterogeneous DB migration typically achieves 70-80% automatic schema conversion; expect to manually address the rest.

Refactor (Re-Architect): Highest ROI, Highest Risk

Redesign monolithic apps as microservices, move from VM-based to containers/serverless. Requires code-level changes.

Refactor tool ecosystem:

ScenarioTool
Java/IIS app → containersApp2Container (A2C)
.NET Framework → .NET CorePorting Assistant for .NET
Monolith → microservices (gradual)Refactor Spaces
End-of-Support Windows 2003/2008 → safe migrationEnd-of-Support Migration Program
New serverless architectureLambda + API Gateway + DynamoDB

7R Decision Tree (For Exam Quick Answers)

System assessment begins
│
├─ System no longer used? → YES → Retire (decommission)
│
├─ No migration ROI, technical constraints? → YES → Retain (keep on-premises)
│
├─ VMware vCenter environment, migrate as-is? → YES → Relocate (VMC)
│
├─ Fast cloud entry, minimal changes? → YES → Rehost (MGN)
│
├─ SaaS more suitable for this function? → YES → Repurchase
│
├─ DB/OS changes improve cost and operations? → YES → Replatform (DMS+SCT)
│
└─ Maximize cloud-native benefits? → YES → Refactor (A2C, Serverless)

Migration Process: Five-Stage Journey

Cloud migration is a process, not a tool execution. AWS presents a standard five-stage model.

1. Discovery (Assess current state)
   └── ADS, Migration Evaluator, manual interviews
   └── Collect server inventory, dependencies, TCO data

2. Assess (Evaluate and plan)
   └── 7R decisions, prioritization, dependency analysis
   └── MRA (Migration Readiness Assessment)

3. Mobilize (Prepare infrastructure)
   └── Landing Zone (AWS Control Tower)
   └── Network (VPC, Direct Connect, VPN)
   └── Security & governance (SCP, IAM Identity Center)
   └── Pilot migration

4. Migrate (Execute transfer)
   └── Wave planning (batch based on dependencies)
   └── MGN, DMS, A2C, DataSync, Snow Family
   └── Validation & cutover

5. Optimize (Right-size and cost-optimize)
   └── Right-Sizing (Compute Optimizer)
   └── Reserved Instances, Savings Plans
   └── Monitoring and cost optimization

🔍 Deeper Dive: The importance of wave planning. Migrating 1,000 servers in a "big bang" has high failure risk. Create waves based on dependency maps. Wave 1: standalone web servers (minimal dependencies). Wave 2: app servers that depend on Wave 1. Wave 3: database servers. If this order reverses, app servers complete migration before databases, causing massive latency spikes. ADS's network dependency data (TCP connection analysis) forms the basis for wave design.

Migration Acceleration Tools Map

PurposeToolKeyword
Server inventory, dependency discoveryADS (Application Discovery Service)"Auto-collect on-premises inventory"
Financial TCO analysisMigration Evaluator"5-year TCO report," "executive reporting"
Server RehostMGN (Application Migration Service)"lift-and-shift," "VM to EC2"
Database migrationDMS + SCT"Oracle to Aurora," "heterogeneous engines"
ContainerizationApp2Container"Tomcat/IIS → containers"
Enterprise-wide programMAP"AWS funding," "partner support"
Unified progress dashboardMigration Hub"Unified tracking," "home region"

AWS MAP (Migration Acceleration Program)

MAP is not a tool—it's a program. It targets large-scale migrations (1,000+ servers or $100K+ expected AWS spend) and packages AWS funding, expertise, and tools.

StageNameActivitiesIncentive
1AssessMRA, business casePartner funding
2MobilizeLanding Zone, pilotAWS migration credits
3Migrate & ModernizeActual transfer, optimizationUsage credits (Migration Credits)

🎯 Scenario: "Migrate 1,500 servers in 18 months, need TCO report for executives, want AWS expert support and funding incentives" → Answer: MAP + Migration Evaluator. MAP is the funding/consulting/tool package program; Migration Evaluator is the TCO reporting tool.

Comparison: Replatform vs Refactor (Exam Boundary)

The most confusing distinction on the exam.

CriterionReplatformRefactor
Code changesNone or minimalYes (sometimes complete rewrite)
Architecture changesNoneYes (monolith → MSA, etc.)
ExampleEC2 Oracle → Aurora (DMS)Monolith → Lambda + DynamoDB
DurationWeeks to monthsMonths to years
RiskMediumHigh

Blurry boundary case: "Migrate a Java app from Tomcat to EKS via App2Container." Code unchanged, but containerization applied → Replatform leaning Refactor, or classified as Refactor. On the exam, since App2Container's primary purpose is "containerize without code changes," it's classified as a Refactor tool.

📝 Practice Questions

Click a choice to reveal the answer and explanation.

Question 1

A company has 1,200 physical servers and 500 VMware VMs. They want to quickly migrate physical servers to the cloud, and they want to keep using their existing vCenter and vMotion for the VMware environment. Which R is most suitable for each?

Question 2

Of 200 servers discovered by ADS, 50 are found to have average CPU 2%, no traffic, and last login 1 year ago. Which R should apply to these servers?

Question 3

A manufacturer wants to migrate a 100TB Oracle DB to AWS. They want to eliminate Oracle Enterprise licensing costs, keep application code unchanged, and want automatic stored procedure conversion. Which R and tools fit best?

Question 4

A company's in-house CRM system has legacy code with high maintenance costs. Its functionality is identical to commercial CRM SaaS. Which R is most suitable?

Question 5

You need to complete a company-wide 5,000-server migration in 18 months. You want to leverage AWS funding support, expert consulting, and partner ecosystem. What should you use?

Question 6

Based on ADS-collected data, you need to submit an "on-premises vs AWS 5-year cost comparison report" to executives. Which tool do you use?

Question 7

A company wants to migrate a Tomcat Java web app to EKS. They want to generate container images and EKS manifests automatically without touching source code. Which tool is suitable?

PreviousWeek 5 Review: Global Architecture Integrated ScenariosWeek 5 · Day 5Next AWS MGN Deep Dive: The Physics of Block-Level Replication, Comparison with DRS, and Migration Hub OrchestratorWeek 6 · Day 2

Official references

  • SAP-C02 official exam page(opens in a new tab)
  • Amazon EC2 documentation(opens in a new tab)
  • Amazon RDS · Aurora documentation(opens in a new tab)
  • AWS DMS documentation(opens in a new tab)
  • Amazon EKS documentation(opens in a new tab)
  • AWS Lambda documentation(opens in a new tab)

On this page

  • 7R Framework: Understanding as a Spectrum
  • Detailed Analysis of Each R
  • Retire: The Value of Decommissioning
  • Retain: Strategic Choice to Keep On-Premises
  • Relocate: VMware-Specific Case
  • Rehost (Lift-and-Shift): Speed First
  • Repurchase: SaaS Conversion
  • Replatform: Maintain Core Architecture, Partial Optimization
  • Refactor (Re-Architect): Highest ROI, Highest Risk
  • 7R Decision Tree (For Exam Quick Answers)
  • Migration Process: Five-Stage Journey
  • Migration Acceleration Tools Map
  • AWS MAP (Migration Acceleration Program)
  • Comparison: Replatform vs Refactor (Exam Boundary)